System Integration
System Integration
E-bike Controller × Battery × Motor co-design with a measurable validation plan and EVT→PVT delivery package.

Deliverables
What you get as an integration-ready package:
- System responsibility matrix: controller vs BMS vs pack — limits, derating, fault handling
- Interface mapping: CAN/UART + wiring/pinout — versioned documentation for integration and service
- Tuning baseline: parameter set + change log aligned with duty cycle targets
- Validation evidence package: test plan + pass/fail summary + issue log
- Production handoff checklist: QA gates, release artifacts, traceability fields (program-defined)
Integration workflow
A program plan that aligns engineering output with decision gates:
- Requirements freeze
Voltage, motor type, sensing, duty cycle, compliance targets, production constraints - EVT (Engineering Validation Test)
Bench + ride baseline, initial tuning, interface validation, first evidence set - DVT (Design Validation Test)
Thermal margin confirmation, fault robustness, derating behavior, integration maturity - PVT (Production Validation Test)
Manufacturing constraints, QA checkpoints, release package, change control
Typical KPIs
KPIs are defined upfront and validated against a program duty cycle:
- Thermal margin under sustained load (defined ambient + duty cycle)
- Derating behavior (smoothness, stability, predictability)
- Fault recovery behavior (clear states, safe fallback, no undefined behavior)
- Repeatability across builds (same tuning outcome on multiple units)
- Diagnostic completeness (fault codes, counters, event logs usable for service)
- Documentation completeness (integration notes + version control + release artifacts)
Who it’s for
Best fit scenarios:
- OEM programs that need a predictable EVT→PVT timeline
- Platforms requiring controller–battery coordination (power limits, fault handling, diagnostics)
- Teams that want measurable performance and validation evidence, not subjective “ride feel” claims
- Projects where production integration (DFM/QA/release control) is part of the scope
FAQ
Q: Do you provide firmware source code?
A: Typically delivered as an integration-ready package with documented interfaces and tuning workflow. Source access depends on the IP/commercial model.
Q: Can you integrate with our existing battery pack and motor?
A: Yes, if interface responsibilities and test access are defined (CAN/UART mapping + wiring + duty cycle targets).
Q: What do you need to start?
A: Target voltage, motor model/spec, sensing approach, duty cycle, compliance targets, and the intended production volume/timeline.
Get a system proposal for your bike platform.