System Integration

System Integration

E-bike Controller × Battery × Motor co-design with a measurable validation plan and EVT→PVT delivery package.

Deliverables

What you get as an integration-ready package:

  • System responsibility matrix: controller vs BMS vs pack — limits, derating, fault handling
  • Interface mapping: CAN/UART + wiring/pinout — versioned documentation for integration and service
  • Tuning baseline: parameter set + change log aligned with duty cycle targets
  • Validation evidence package: test plan + pass/fail summary + issue log
  • Production handoff checklist: QA gates, release artifacts, traceability fields (program-defined)

Integration workflow

A program plan that aligns engineering output with decision gates:

  • Requirements freeze
    Voltage, motor type, sensing, duty cycle, compliance targets, production constraints
  • EVT (Engineering Validation Test)
    Bench + ride baseline, initial tuning, interface validation, first evidence set
  • DVT (Design Validation Test)
    Thermal margin confirmation, fault robustness, derating behavior, integration maturity
  • PVT (Production Validation Test)
    Manufacturing constraints, QA checkpoints, release package, change control

Typical KPIs

KPIs are defined upfront and validated against a program duty cycle:

  • Thermal margin under sustained load (defined ambient + duty cycle)
  • Derating behavior (smoothness, stability, predictability)
  • Fault recovery behavior (clear states, safe fallback, no undefined behavior)
  • Repeatability across builds (same tuning outcome on multiple units)
  • Diagnostic completeness (fault codes, counters, event logs usable for service)
  • Documentation completeness (integration notes + version control + release artifacts)

Who it’s for

Best fit scenarios:

  • OEM programs that need a predictable EVT→PVT timeline
  • Platforms requiring controller–battery coordination (power limits, fault handling, diagnostics)
  • Teams that want measurable performance and validation evidence, not subjective “ride feel” claims
  • Projects where production integration (DFM/QA/release control) is part of the scope

FAQ

Q: Do you provide firmware source code?

A: Typically delivered as an integration-ready package with documented interfaces and tuning workflow. Source access depends on the IP/commercial model.

Q: Can you integrate with our existing battery pack and motor?

A: Yes, if interface responsibilities and test access are defined (CAN/UART mapping + wiring + duty cycle targets).

Q: What do you need to start?

A: Target voltage, motor model/spec, sensing approach, duty cycle, compliance targets, and the intended production volume/timeline.

Get a system proposal for your bike platform.